Baoqiang Zheng

Baoqiang Zheng (Bao) is a professional consultant with over 25 years of experience in construction dispute avoidance and dispute management. He has been involved in claims for major infrastructure schemes around the world and has acted as delay expert.

Baoqiang has strong analytical skills and a flexible approach. He possesses great insights into the construction market.

Lexology Index – Construction – Global Elite Thought Leader 

Baoqiang has assisted the named expert on a number of occasions in matters of delay. This has included the production of expert reports in arbitration proceedings regarding industrial and infrastructure projects. He has also acted as named delay expert for a combined cycle power plant project in Europe and a coal fired power plant project in Southeast Asia.

Baoqiang specialises in project planning and forensic delay analysis. He has been directly involved in a variety of major international projects across Africa, Asia, Australia, Europe and the Middle East; regarding the preparation and defence of claims, disputes and arbitrations on behalf of contractors, subcontractors, clients and legal counsels.

Baoqiang has extensive experience in buildings, infrastructure, oil and gas, power and transportation projects. He has provided services including contract administration, contractual and commercial management, due-diligence, procurement, contract negotiations, disruption analysis, and estimating and cost management.

Baoqiang is a highly-qualified professional, a fellow of the Chartered Institute of Arbitrators and a member of the Royal Institution of Chartered Surveyor (MRICS). He also holds a Project Management Professional certificate (PMP®) from PMI of the USA.

Baoqiang Zheng is heralded as “one of the most experienced experts in China” whose reliability and expertise place him in high demand.

Derek Nelson

Derek Nelson is a Chartered Quantity Surveyor and Chartered Engineering Surveyor, with over 40 years of construction and engineering experience. He has acted as expert on over 85 occasions in delay, disruption and quantum matters.

Derek is highly methodical and thorough in his approach. Derek is a real force to be reckoned with. Thanks to his experience, he is able to convincingly carry across the most difficult concepts and reasoning to a tribunal.

Lexology Index – Construction – Thought Leader

Derek is both an accredited and certified expert witness, fellow and past chairman of The Academy of Experts and has acted as a delay and quantum expert witness in arbitration, conciliation, litigation and mediation and as an expert determiner. He has been cross-examined on over 25 occasions and has delivered concurrent evidence in disputes from Belize to Brunei and Scotland to Singapore. Alongside his work as an expert adviser for ongoing projects, Derek undertakes the role of ‘project neutral’, independently reviewing international projects in preventative, on-the-job dispute resolution.

In addition to his expert commissions, Derek continues to provide clients with contractual advice, claims preparation and contract administration services on major contracts worldwide. He specialises in the preparation, negotiation and settlement of claims, whether disruption, acceleration or prolongation. Derek delivers advice and procedures to rapidly resolve or avoid disputes in a cost effective and timely manner.

Derek has held senior commercial and contracts positions for major international contractors and owners across Asia, Europe and the Middle East. His expertise includes matters of quantity surveying practice, valuation, damages, contract administration, contract management, commercial management and cost management, which he combines with his tested planning and delay analysis capabilities.

Aside from his extensive accreditations and wide experience, Derek is often called upon to deliver training and seminars on contractual problems, claims preparation, negotiation and dispute resolution. Derek is a contributing author to Delay and Disruption in Construction Contracts, 6th Edition, Chapter 18, Disruption to Progress and Lost Productivity. In October 2018, he was welcomed as a Freeman in the Worshipful Company of Arbitrators.

He has a strong reputation with peers and clients alike and is commended for his “professionalism and thoroughness in evaluation and analysis” as well “the breadth and depth of his experience”. Derek “performs well under cross-examination” according to respondents who praise his “clear and well-researched reports”. The “impressive” Derek Nelson is a “much respected” figure in the market, commended by respondents for his outstanding work dealing with quantum, delay and disruption disputes.  The “highly respected” Derek Nelson is recognised for his “depth and breadth of technical know-how and industry experience” when it comes to complex construction disputes.  Derek Nelson has a broad international practice and impresses peers with his “high- quality reports, well substantiated conclusions and excellent performance under cross-examination”. Derek Nelson “performs well in cross-examinations” and offers “professional and consistently high-quality work” whilst referred to as “usually the quickest to comprehend the crux of a matter and from there he offers and communicates the practical options or solutions”.  Derek is “a gifted quantum expert” that is commended for his “vigilance” during construction disputes. Nelson’s technical background coupled with his “intimate knowledge of international construction law and arbitration hearings” ensure that he is “highly sought after” to testify in disputes.

Derek possesses large experience on construction issues. He is very capable and has great analytical skills. Derek was methodical and precise in his approach as our client’s delay expert.

Franco Mastrandrea

Franco Mastrandrea is a Chartered Quantity Surveyor and Chartered Arbitrator with over 40 years of experience in the construction industry. He has acted as expert on more than 50 international project management, delay and quantum-related disputes.

Franco is a leading figure in the field. He is a master in delay and quantum construction matters. Franco is a seasoned expert”
Lexology Index – Arbitration – Thought Leader

From London to Australia and Canada to Antarctica, Franco has extensive and diverse dispute resolution expertise. With an established record in drafting, interpreting and applying commercial terms in contracts, he successfully combines both knowledge and experience under traditional cross-examination and hot-tubbing.

Franco is widely regarded as an expert who is both well qualified and highly experienced in complex construction issues. He is able to identify the key issues of principle in construction appraisal disputes and provide clients with greater clarity as to project performance. Franco combines management, construction and legal knowledge, enabling him to deliver balanced opinions on the performance of those involved in projects, and objective appraisals of the appropriate or likely outcomes.

Franco’s expert commissions cover a wide range of industries including oil and gas in Australia, Canada, Kazakhstan, North Africa and South East Asia; transport infrastructure in the Caribbean and the UK; power generation, from CCGT to windfarms, in the UK; and numerous building and infrastructure projects around the world.

Franco Mastrandrea holds a doctorate that addresses the law, practice and quantification of construction claims. He is a CEDR-accredited mediator, on the RICS register of Dispute Board Members and the FIDIC President’s list of adjudicators, a Chartered Arbitrator, and on arbitrator lists maintained by RICS and international arbitration centres in Dubai, Hong Kong and Singapore. Franco has written extensively on the evaluation of construction claims and is listed in Lexology Index as a “highly respected expert” who is “a really extraordinary witness”.

Franco Mastrandrea is commended as “one of the most experienced thinkers that can be found today in the quantum market”, winning praise for his strategic advice in practical and technical matters.

Ekrem Kaya

Ekrem Kaya is a widely experienced civil engineer with over 25 years of construction industry experience. He has acted as expert witness in matters of delay and quantum.

Ekrem is one of the best quantum experts in international arbitration. He can work at a fast pace

Lexology Index – Arbitration

Ekrem has been appointed as expert witness on numerous occasions and has been cross-examined twice, including giving concurrent evidence (‘hot tubbing’). He has experience in complex international construction disputes, including two major investment treaty (ICSID) arbitrations, and has been appointed as a dispute adjudication board (DAB) chairman.

Ekrem also has comprehensive practical knowledge of all forms of delay analysis, specialising in the ‘Windows’ and ‘Time Impact Analysis’ methods; predominantly in circumstances where previous submissions based on other forms of analysis were not persuasive or successful. He is adept with all forms of planning software and has experience with a wide range of programmes used to effectively manage construction projects.

Ekrem’s broad experience spans the fields of project management, project controls, contract management, claims management, forensic delay analysis and various forms of dispute resolution. He has worked on projects in Turkey and across Asia, Europe and the Middle East including high-profile oil and gas, civil engineering, building and transportation projects.

Ekrem is fluent in both Turkish and English. He conducts various seminars on issues ranging from delay analysis, risk allocation under domestic and international forms of contract, and the assessment of entitlement to additional payment in the context of delay and changed circumstances.  Ekrem is a fellow of the Chartered Institute of Arbitrators and the Chamber of Civil Engineers in Istanbul, a practising member of the Academy of Experts and is dual-qualified with an LLM in construction law and arbitration.

Ekrem delivers top-tier service to his clients. He’s one of the most active and versatile professionals out there.

Timothy Harwin

Timothy Harwin is a civil engineer with over 20 years of construction industry experience. He has acted as a delay expert witness on more than 20 occasions.

Tim is the go-to forensic delay expert for matters in South Africa. He is diligent, persuasive and trustworthy. Tim and his team are our go-to experts for delay, quantum and forensic expert services.

Lexology Index – Arbitration

Tim has testified and been cross-examined as an expert witness in arbitration proceedings, including giving concurrent evidence (hot-tubbing). He has extensive experience in the preparation of expert witness reports for adjudication, arbitration and litigation.

Tim has a strong technical and engineering background in the delivery of large building, civil, energy, and infrastructure projects, enabling him to provide his clients with sound and reliable advice. He has provided expert services on a range of building and infrastructure disputes across Asia, Africa, Australia and the Middle East for disputes arising on building, road, rail, bridge, power stations, oil pipelines, water treatment facilities, LNG facilities, mining infrastructure and renewable energy projects.

Tim specialises in the analysis of delay, disruption and programming on construction projects. He has supported clients for projects with values up to US$1.5 billion and disputed values in excess of US$200 million.

Timothy Harwin holds degrees in civil engineering, business and construction law. He is a member of the Academy of Experts and the Chartered Institute of Arbitrators.

Timothy Harwin is a trusted name in South Africa. The phenomenal delay expert is renowned for his forensic analysis in high-value construction disputes across transport, energy, and infrastructure sectors globally.

Mark Dixon

Mark Dixon is a dual-qualified Chartered Surveyor and Chartered Arbitrator with 40 years’ experience in engineering and construction, and is a respected international quantum expert witness and dispute resolver.

Mark is an excellent expert whom I recommend highly. He finds key quantum issues and gets his opinions across concisely.

Lexology Index – Construction – Thought Leader

Mark first testified as an expert witness in court in 1995. He has given oral testimony in the English courts (including the TCC) and in various international arbitration proceedings, by traditional cross-examination and concurrent expert conferencing. His expert commissions have included disputes up to US$1.2 billion on contracts up to US$2.5 billion, within wider projects up to US$17 billion in value.

Mark specialises in major oil and gas, marine, industrial, power and utilities sector projects and has been appointed as expert on offshore and onshore oil and gas facilities in Asia, Australia, Europe and the Middle East; shipbuilding contracts in Europe and Asia; and power, utilities and process plant projects in Europe. He has also been appointed on various infrastructure and building construction projects in Europe.

Mark is also an experienced third party neutral. He has been appointed as adjudicator or arbitrator on over 500 cases. He holds the CIArb’s Arbitration and Adjudication Panel Practice Certificates and is on adjudication panels of the RICS, ICE, CIArb, TeCSA, RIBA, AICA, CIC and CLG, and arbitration panels or lists of the RICS, CIArb, ICC, LCIA, HKIAC, AIAC, CIETAC, SHIAC, SCIA, LMAA (Supporting Member) and PIAC.

Mark’s expert and dispute resolution practice is underpinned by experience in estimating, tendering, project surveying, contract administration, commercial project and contract management, delay analysis, and claims consultancy.  He has been involved in contracts up to US$11 billion on projects valued up to US$30 billion.

Mark Dixon ranks amongst the best players in our construction quantum and delay experts research, maintaining a reputation as “an amazing expert” for his extensive experience across high-value construction disputes.

William A Cook

William A Cook (Bill) is a registered civil engineer with over 40 years of program, project, construction and operations management experience. He employs his skills to forensically analyse claims and resolve disputes and has prepared or provided expert analyses on hundreds of appointments.

William Cook is a highly skilled expert with 40 years of experience in the construction industry, recognised for his first-rate testimony in high-value disputes. His extensive background in project management and claims resolution makes him a sought-after authority in the field.

Lexology Index – Consulting – Construction – Quantum Delay and Technical

Bill’s experience includes programme, project, construction and operations management and post-construction claims resolution, with hands-on project experience including a US$850 million waste-water facility programme and a US$700 million rail line. Bill’s expertise spans a broad variety of project types including airports, casinos, concert halls, courthouses, education, highways, hospitals, hotels, industrial, libraries, office buildings, parking structures, sports stadiums, theme parks and transportation facilities. He was also a construction management specialist to FEMA’s Public Assistance group in the aftermath of Hurricane Katrina.

Bill has testified in a variety of dispute resolution forums including jury trials, arbitrations and mediations. He has testified and analyzed claims involving the areas of schedule and delay analysis, construction management standard of care, costs audits and impacts, contractor performance, extra work, contractor defects, errors and omissions and damages.  Case size has ranged from less than US$1 million to more than US$100 million.

Bill is a professional engineer in California. He earned a BS in civil engineering from Rutgers University College of Engineering and is a past member of the board of directors of the Construction Management Association of America, as well as a past Los Angeles chapter president. He has presented seminars to the LA County Bar Association and to many other trade associations and conferences on a variety of subjects from reading plans and structural engineering to scheduling and claims analysis.

William A Cook is a highly-respected expert in his field and is praised for his “vast industry awareness” and “intelligent and intuitive approach” to matters.

William has tremendous experience as a construction expert. His technical skills are outstanding.

Tim Chitester

Tim Chitester is a registered professional engineer with over 45 years of experience in the engineering, design and construction industry. He is an authority in the resolution of construction disputes, construction claims, project management and property loss and business interruption claims. Tim has been appointed as a delay, quantum or technical expert on more than 100 occasions.

Timothy is a very smart practitioner. He is a first-rate scheduling and delay expert. He has tremendous experience as an expert witness in complex construction litigation.

Lexology Index – Construction

Tim is a recognized construction expert and has testified in federal court, federal mediation, state court, AAA arbitration, ICC arbitration and in other international arbitration forums. He provides expert reports and testimony, for disputes ranging from millions to those in excess of $1 billion, across Asia, Europe, the Middle East and North and South America. He has acted as expert in matters of construction management, contractor and engineer standard of care, trade use of contracts, cost, schedule, and productivity with resultant delay and disruption.

Tim has provided property loss and surety support services, including the review and evaluation of more than 150 contractors, for standard of care and project implementation programs. He also provides consultancy for clients regarding energy services, from energy conservation and demand side management to central utility plants and distributed generation.

Tim is widely experienced as an engineering manager and project manager. He has a background as an engineering, procurement and construction (EPC) contractor working on a variety of healthcare projects across North America. He also has hands-on EPC and consulting experience in projects ranging from industrial, process and utilities to power generation, oil and gas and buildings.

Tim is a licensed professional engineer in the states of Florida, Iowa and Pennsylvania, and holds a Bachelor of Science degree in mechanical engineering from the University of Pittsburgh. He is a member of the ABA Forum on Construction Law, the ABA TIPS property law section, the Loss Executives Association and the American Society of Mechanical Engineers; and has been published on matters of construction disputes on numerous occasions.

Timothy Chitester is a leading quantum, delay, and technical expert with over 45 years of global experience providing high-quality, expert analysis on the cost and schedule impacts of delay and disruption across multi-billion-dollar construction disputes.

Karen Best

Karen Best is a Chartered Civil Engineer with nearly 30 years of experience in the construction and engineering industries. She worked as a site agent and senior engineer for almost a decade before moving into construction consultancy, giving her a strong grounding for the delay expert and expert assistant roles that she has undertaken.

Karen is very user-friendly and can explain complex delay matters clearly. She is very articulate. She is very easy to work with.

Lexology Index – Construction – Thought Leader

Karen has been appointed as delay expert on more than 15 occasions regarding building and power related project disputes. She has also assisted the named expert on 15 occasions on various projects across the Middle East, Europe and the Americas. Karen has been cross-examined in arbitration and has a wide range of expert witness training from various institutions including the Academy of Experts, Bond Solon, the Expert Witness Institute and Pearson Education.

Karen is experienced in construction management, project planning and critical path methods of retrospective delay analysis. She has worked on expert appointments related to delay and disruption claims regarding civil engineering and building contracts from power plants in Qatar and industrial facilities in Australia to numerous buildings and infrastructure projects across Europe, the UK and Africa.

Karen is widely experienced as a site engineer and has worked on a variety of civil engineering projects across the UK. These range from marine, bridges and heavy civils projects including work on the construction of the London Eye. As a site agent, Karen was responsible for various projects, planning and organising works on site, and liaising with clients and subcontractors.

Karen has a Masters in Construction Law and Arbitration and is a regular presenter at joint CIOB masterclasses. She presents on the subjects of delay analysis and developing the master programme, and has presented at the RICS autumn seminar series on the same topic. Karen is highly regarded by clients and colleagues alike; during last minute preparation for a potential testimony a client espoused that, “she was well prepared and supremely confident in assessing and digesting difficult subject matter” and that, “the intricate … analysis was evenly balanced with an overall assessment [that] fit perfectly with the legal strategy of the case”. Senior experts that she has assisted advise that Karen is, “an invaluable lead assistant” and that she excels at, “getting to grips with the detail”.

With over three decades of experience, Karen Best is a “very experienced expert” who is commended by peers and clients alike for her “attention to detail and excellent communication skills” when handling major construction delay issues.

X

Follow HKA on WeChat

关注我们的官方微信公众号

HKA WeChat